Difference between revisions of "No Idea"

From LinuxWorks Minetest Server Wiki
Jump to navigation Jump to search
 
Line 32: Line 32:
  
 
In January 2020, {{Player|BakerPrime}} announced the construction of new premises for [[PrimeCorp]] at No Idea, on the east side of the tracks. Construction is anticipated to begin on the new company campus in March 2020 and be completed by August 2020. The new campus will include: 4 factory buildings, PrimeCorp office facility, PrimeTek office facility, industrial train loading facility, factory outlet store, a large smokestack (for power) and a warehouse. All construction will be completed by the major construction and electrical-technical company PrimeTek.  
 
In January 2020, {{Player|BakerPrime}} announced the construction of new premises for [[PrimeCorp]] at No Idea, on the east side of the tracks. Construction is anticipated to begin on the new company campus in March 2020 and be completed by August 2020. The new campus will include: 4 factory buildings, PrimeCorp office facility, PrimeTek office facility, industrial train loading facility, factory outlet store, a large smokestack (for power) and a warehouse. All construction will be completed by the major construction and electrical-technical company PrimeTek.  
 +
 +
February 10th 2020: Construction of the first building, Baker Manufacturing Factory Outlet Store, is completed.
 +
February 13th 2020: Construction of a nearly identical building by Survivalg, on the other side of the tracks, is completed.
  
 
[[Category:Stations]]
 
[[Category:Stations]]
 
[[Category:S23]]
 
[[Category:S23]]

Latest revision as of 19:03, 14 February 2020

No Idea
Industrial Estate
Coordinates: 🌍 -2300,10,-790
FoundedSeptember 2019
Founded bysurvivalg
Government
 • Mayorsurvivalg (Die PARTEI)
No Idea
No Idea Station.png
An S23 service waits to depart for Bamboo Hills
Coordinates🌍 -2300,10,-790
Line(s)S23
Construction
ArchitectHume2
Services
Preceding station   Local Lines   Following station
toward Arcadius
S23
toward Redwood
Preceding station   Express Lines   Following station
Terminus
E32
toward Euler Street

No Idea is a station between Tanh Cliffs and Laza's Field made by Hume2. It is served by the line Dry Island - Bamboo Hills. There is no idea why this station is called No Idea. The only explanation is that Hume2 had no idea what to call this station. However, calling a station No Idea is also an idea, so it is a nonsense. It also seems like no-one had an idea to build here anything except the station.

Industrial Use

In September 2019, survivalg announced he would move his industrial operations to No Idea from Edenwood due to poor design of his Edenwood facilities. The hardware store will still stay in Edenwood and will be served by regular freight trains from No Idea over the DURT railway line.

Construction of the industrial complex started in early December 2019 with the construction of roads and a worker's apartment complex prototype, which is due to be copied by digtrons and reproduced in large numbers around the premises. The opening date of the factory is still unknown, inside sources however report a construction time of several months.

In January 2020, BakerPrime announced the construction of new premises for PrimeCorp at No Idea, on the east side of the tracks. Construction is anticipated to begin on the new company campus in March 2020 and be completed by August 2020. The new campus will include: 4 factory buildings, PrimeCorp office facility, PrimeTek office facility, industrial train loading facility, factory outlet store, a large smokestack (for power) and a warehouse. All construction will be completed by the major construction and electrical-technical company PrimeTek.

February 10th 2020: Construction of the first building, Baker Manufacturing Factory Outlet Store, is completed. February 13th 2020: Construction of a nearly identical building by Survivalg, on the other side of the tracks, is completed.